参考文献/References:
[1] ABSI N, DAUZÉRE-PÉRÉS S, KEDAD-SIDHOUN S, et al. Lot sizing with carbon emission constraints[J].European Journal of Operational Research,2013,227(1):55.
[2] BAZAN E, JABER, M Y, SAADANY A M. Carbon emissions and energy effects on manufacturing-remanufacturing inventory models[J].Computer and Industrial Engineering,2015,88:307.
[3] ZOUADI T, YALAOUI A, REGHIOUI M, et al. Hybrid manufacturing/remanufacturing lot sizing problem with returns supplier's selection under carbon emissions constraint[J].IFAC-Papers Online,2016,49(12):1773.
[4] 朱慧赟,常香云,夏海洋,等.碳限额与交易约束下的企业制造/再制造生产决策[J].系统管理学报,2015,24(5):737.
[5] CHANG X Y, XIA H, ZHU H Y, et al. Production decisions in a hybrid manufacturing-remanufacturing system with carbon cap and trade mechanism[J].International Journal of Production Economics,2015,162:160.
[6] 申成然,熊中楷.碳排放约束下制造商决策研究[J].系统工程学报,2014,29(4):537.
[7] 刘碧玉,陈伟达,杨海东.基于REVD考虑碳排放的零部件再制造决策[J].管理科学学报,2016,19(10):48.
[8] BOUZON M, RODRIGUEZ C M T, QUEIROZ A A. Cell layout application in product recovery:a lean proposal to increase efficiency in remanufacturing[J].Chinese Business Review,2012,11(5):467.
[9] 朱硕,江志刚,张华,等.面向再制造工艺单元重构的设备布局模型研究[J].制造技术与机床,2013(12):32.
[10] SELIGER G, FRANKE C, CIUPEK M, et al. Process and facility planning for mobile phone remanufacturing[J].CIRP Annals-Manufacturing Technology,2004,53(1):9012.
[11] 李成川,李聪波,曹华军,等.基于GERT图的废旧零部件不确定性再制造工艺路线模型[J].计算机集成制造系统,2012,18(2):298.
[12] 李聪波,李玲玲,曹华军,等.废旧零部件不确定性再制造工艺时间的模糊学习系统[J].机械工程学报,2013,49(15):137.
[13] 李玲玲,李聪波,杜彦斌,等.基于颜色Petri网的再制造工艺过程建模与优化调度方法[J].中国科技论文,2015,10(4):407.
[14] 何彦,王乐祥,李育锋,等.一种面向机械车间柔性工艺路线的加工任务节能调度方法[J].机械工程学报,2016,52(19):168.
[15] WANG S J, LIU M. Multi-objective optimization of parallel machine scheduling integrated with multi-resources preventive maintenance planning[J].Journal of Manufacturing Systems,2015,37:182.